Allendale-Fairfax New Performing Arts Center

The new performing arts center will contain a stage, retractable auditorium seating, multi purpose floor space, group toilets, and a warming kitchen. 

Scope: The scope of work includes: sitework, helical piles, earthwork, asphalt and concrete demolition, grading, concrete, steel framing, steel erection, gym floor, masonry, casework, interior painting, wood veneer, acoustical wall panels, projector screen, sealed concrete, electrical, HVAC, plumbing, LVT, ACT, gym equipment and flooring throughout the new build Performing Arts Center.

Proposals due by
Thursday, July 10th by 2:00pm.

Construction completion is scheduled to be August 2026.

  • Division 02: Existing Conditions

    • Demolition

    Division 03: Concrete

    Division 04: Masonry

    Division 05: Metals

    Division 06: Wood, Plastics, & Composites

    • Casework

    Division 07: Thermal & Moisture Protection

    • Roofing, Waterproofing, & Thermal Protection

    Division 08: Openings

    • Glass, Glazing, Doors, Frames, Hardware, & Coiling Doors

    Division 09: Finishes

    • Metal Stud Framing, Gypsum, ACT Ceiling, Base, Tile Flooring, Wood Flooring, Athletic Floor, Multi Purpose Flooring, Resinous Flooring, & Painting

    Division 10: Specialties

    • Toilet Accessories, AED Cabinets, Project Screen, Ice Maker, FE & FECs, Plaques, Dimensional Letter Signage, Toilet Compartments, & Metal Canopies

    Division 11: Equipment

    • Warming Kitchen Equipment, Basketball Goals, Stage Equipment (Curtains, Lightings, Black Box)

    Division 12: Furnishings

    • Manufactured Casework, Countertops, Telescoping Chair Platforms

    Division 21: Fire Suppression

    Division 22: Plumbing

    Division 23: HVAC

    Division 26: Electrical

    Division 27: Communications

    • Gym Sound System

    Division 31: Earthwork

    Division 32: Exterior Improvements

    • Landscaping & Hardscape

    Division 33: Utilities

Sign up to receive updates for the Allendale-Fairfax Performing Arts Center project!

For more information:

Patrick Faulkner Pre-Construction Services

803.979.7749 | pfaulkner@mbkahn.com

For certification questions:

Margaret Rush JGM Associates

843.819.4923 | mrush@mbkahn.com